Télécharger Imprimer la page

Waeco AirConServiceCenter ASC5500G RPA Notice D'utilisation page 113

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 212
ASC5500G RPA
8.7.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value,
otherwise continue with chapter "Selecting connections" on
page 114.
3. Enter the amount of refrigerant oil which was previously drained or
which is required.
4. Press the cursor key .
5. Enter the additive quantity.
6. Press the cursor key .
7. Enter the refrigerant quantity.
8. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the
quantity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
EN
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Yes
No
ml.
0
ml.
7
g.
500
Operation
113

Publicité

loading