Télécharger Imprimer la page

SPORTSTECH BRT400 Manuel page 26

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
FREE SPACE AND TRAINING SPACE
The training area (A) should be at least 2.6m. The free space (B) should be at least 0.6 m larger
than the training area in the direction in which the equipment is accessed. The free area must also
be sufficient to allow for the area needed for an emergency descent. If two devices are next to each
other, the free area can be considered a shared area between them.
B
(0,6 m)
A
A
B
B
(2,6 m)
(2,6 m)
(0,6 m)
(0,6 m)
B
(0,6 m)

Publicité

loading