Télécharger Imprimer la page

Subaru H001SFJ800 Manuel D'installation page 19

Xv crosstrek

Publicité

Les langues disponibles

Les langues disponibles

Operation Check
1. Confirmation of the Installation.
Before operation confirmation, review the Installation Instructions and make sure that all connections are
correct. To make sure that everything in the vehicle is working properly, you can check by connecting the
Subaru SSM. If it has problems, you will need to fix them first.
2. Operation Confirmation
Close the hood, place shift lever in park [P] with parking brake set, turn off lighting switch, turn "ENGINE
START STOP" Button to OFF get out of the car, and close all of the doors.
Operation
Press the LOCK button of the vehicle's
remote twice within two seconds, then
press and hold the LOCK button for
more than three seconds.
1
Press and hold the LOCK button of
2
the vehicle's remote for more than two
seconds.
Sit inside the vehicle and close the
3
door, then perform step 1 again to
Smart Engine Start.
4
Push the automatic window switch.
Pull the hood release lever and fully open
5
the hood while the engine is running.
Close the hood, press the "ENGINE
6
START STOP" Button to IG-ON, and
push the automatic window switch.
After reassembly of the vehicle,
perform function checks on all electrical
7
components that were disconnected
during the installation of this accessory.
Confirmation point
·
The horn sounds once.
·
The Engine starts.
·
After the engine starts, the horn
sounds once at the same time
as all the front position lights, tail
lights flash once.
·
All marker lights, tail lights turn on
afterwards.
·
Engine stops.
·
All marker lights, tail lights turn off.
·
Refer to Step 1.
·
The window does not open.
·
Engine stops.
·
The window opens.
·
It works correctly.
- 19 -
Checking point if operation failed
Check C (page 25)
Check E (page 30)
-
Check wiring diagram for connection of
connector G with signal specification
for PWI on pages 33- 34.
Check signal specification for HOOD
on page 34.
Check wiring diagram for connection of
connector G with signal specification
for PWI on pages 33-34.
Confirm that all connectors are plugged
in properly.

Publicité

loading

Ce manuel est également adapté pour:

H001ssg820