Step 10: Attaching the Gate Control Rod
a. Slide gate control lever forward and attach hook at bottom of
rod to spring at hopper base
b. Attach gate control rod to upper screw on gate control by
removing the screw first, attaching the rod, and then
re-attaching the screw
Step 11:
Both Hand Grips slide onto both the left and right
handle bars. The Grips should Slide right on.
Step 12:
Secure edge control cable with zip ties (provided) onto the
handle as shown in image.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
Zip tie
Zip tie