Installation inside a stud partition
1. When using UW 75 profiles, bend the feet (C) of the element
for better positioning, see Fig. [8].
2. Position the element in the floor profile.
3. Drill fixing holes and insert the wall plugs provided,
see Fig. [9].
4. Fasten the feet of the element (C) with the screws
and washers provided.
5. Align element (A) horizontally and adapt the feet (C) of the
element to the height of the floor structure, see Fig. [10].
6. Fasten the element flush to the C profiles using the
self-tapping screws provided, see fold-out page III, Fig. [11].
Installation in front of a stud partition
1. When using UW 75 profiles, bend the feet (C) of the element
for better positioning, see fold-out page II, Fig. [8].
2. Position the element in the floor profile.
3. Align element (A) horizontally and adapt the feet (C) of the
element to the height of the floor structure,
see fold-out page III, Fig. [12].
4. Attach wall bracket (E) (special accessory) to the plywood
board (B), see Fig. [13].
5. Drill fixing holes and insert the wall plugs provided.
6. Fasten the feet of the element (C) with the screws
and washers provided.
7. Align element (A) perpendicularly and fasten with screws,
see Fig. [14].
Adapting element to urinal
1. Adapt cross rails to urinal bowl, see Fig. [15].
2. Insert and fasten threaded bolt (F) for attaching the urinal
in accordance with the urinal dimensions, see Fig. [16].
Water connection
Do not solder the connections between the pipe and
housing, otherwise the built-in isolating valve may be
damaged.
1. Connect water supply line (K), see Fig. [17].
2. Install curved waste bend (J).
3. Close isolating valve (L), see Fig. [17].
4. Open hot and cold water supply and check connections
for water-tightness!
5. Open isolating valve (L) and flush pipes.
6. Close isolating valve (L).
7. Fit structural shell protection (G) and fasten with pipe
end plug (H), see Fig. [16].
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - info@mytub.co.uk
All manuals and user guides at all-guides.com
Electrical installation
Electrical installation work must only be
performed by a qualified electrician. This work
must be carried out in accordance with the
regulations to IEC 364-7-701-1984 (corresponding
to VDE 0100 Part 701) as well as all national and
local regulations.
• Only round cables with max. outside diameter 6 to 8.5mm
may be used.
• The voltage supply must be separately switchable.
1. Connect the earth cable, see Fig. [17]
2. Insert 230 V connecting cable (M) into the transformer
base (N), see Fig. [18]. Strip insulation in accordance
with Fig. [18].
3. Pull sleeve (O1) over the two live wires (M1).
4. Attach lustre terminal (O); observe assignment,
see Fig. [19].
5. Secure all three wires with the cable tie (O2) near the lustre
terminal (O).
6. Route cable (M2) in an arc and position lustre terminal (O)
on locators in transformer base (N), see Fig. [20] on
fold-out page IV.
7. Secure cable (M) using screws (Q) and strain relief (P),
see Fig. [20].
8. Fasten cover (R) in base (N) using screw (S).
Further installation
Note for installer:
• No water lines must be routed in front of the sensor,
see Fig. [21]. This would lead to malfunctions.
• Do not carry out any further installation procedures until the
tiling is completed.
Note for tiler:
• Do not obstruct inspection aperture for isolating valve
and electronics, see Fig. [21].
Performing final installation
Further installation procedures are explained in the final
installation.
Replacement parts, see fold-out page I
( * = special accessories).