Télécharger Imprimer la page

Franke KEP ACSL EBF SND Serie Installation page 9

Publicité

Les langues disponibles

Les langues disponibles

SECTION 3: INSTALLATION
B. CONNECTING THE WATER LINE (continued)
To retrofit the Bottle Filler to an existing unit, follow the
instructions below.
If the cooling tank is non-pressurized, then go to the addendum section, "Pressurizing the cooling tank". Other-
wise, proceed to Step 1 below. Non-pressurized units are SINGLE units made since December of 2009. Refer
to the schematic below to identify the system you have.
FIGURE 1
Supply
Water
STEP 1:
With the cooler top removed, find the tube going from the cooling
tank outlet to the valve. The TEE fitting (supplied) will need to con-
nect between the cooling tank and valve. (Figure 3)
10/17 | 036865-047
All manuals and user guides at all-guides.com
Water
valve/regulator
NON-PRESSURIZED
COOLING TANK
FIGURE 2
Supply
Water
PRESSURIZED
COOLING TANK
Outlet Tube (insulated plastic)
FIGURE 3
Water
valve/regulator
VALVE
KEP8AC FAMILY
9

Publicité

loading

Ce manuel est également adapté pour:

Kep acsl ebf stn serieKepwebfKepac-ebf-sndKep8ac-ebf-snd