Télécharger Imprimer la page

Franke KEP ACSL EBF SND Serie Installation page 12

Publicité

Les langues disponibles

Les langues disponibles

SECTION 3: INSTALLATION
C. MOUNTING THE FRAME TO THE WALL
STEP 1:
Place rubber gasket on top of the cooler so it is centered left/right and against the wall. (Figure 11)
STEP 2:
Set the wall frame onto the gasket. Center it left/right and push it against the wall and mark hole locations for wall fasteners. The gasket will
set the frame at the proper height. Use mounting slots that will provide the proper securing location. Make sure to pull the plastic tubing up
through the hole in the frame. (Figure 12)
STEP 3:
Secure frame to the wall with fasteners (not provided).
STEP 4:
Slide sponge tubing insulation over water line.
Connect the tubing to the INLET elbow on the
back of the Hands-free Bottle Filler assembly and
flow switch connector into the port on the circuit
board. (Figure 13)
STEP 5:
Set the bottle filler
cabinet into place. As
you do, feed the ter-
minals on the power
supply cord through
the bushing on the
cooler top. MAKE
SURE the cabinet fits
into the groove in the
rubber gasket on both
sides and front of
the cabinet wrapper.
(Figure 14)
10/17 | 036865-047
All manuals and user guides at all-guides.com
Figure 11
Insert
connector on
end of flow
switch wire
into port on
circuit board
Make sure to pull
the plastic tubing
up through the
hole in the frame.
Rear view of Bottle Filler
Figure 14
Figure 12
Use mounting
slots that will
provide the proper
securing location.
Figure 13
Connect tube
to inlet of the
valve
Plastic tubing
Sponge tubing
insulation
Bottle filler cabinet
Groove in the gasket
12

Publicité

loading

Ce manuel est également adapté pour:

Kep acsl ebf stn serieKepwebfKepac-ebf-sndKep8ac-ebf-snd