Télécharger Imprimer la page

AquaScape 83013 Manuel D'instructions page 15

Masquer les pouces Voir aussi pour 83013:

Publicité

Les langues disponibles

Les langues disponibles

STEP 11
CONT...
Note: It is recommended to install lights (not
included) at this time. Refer to Step 12 to complete
all lighting installation prior to covering the remainder
of the basin with gravel.
• Cover the remainder of the basin with a layer of gravel.
The pump access panel should be covered but accessible
for pump removal or maintenance.
All manuals and user guides at all-guides.com
STEP 12
ADD OPTIONAL LED LIGHTING
• Aquascape LED Garden and Pond Lighting (not included)
• The deck of the basin is covered with deck cylinders that
• Determine the desired
• Run each lighting cable into
US (866) 877-6637 |
can be added to bring the water feature to life at night.
can be drilled to run low-voltage lighting cables beneath
the deck, keeping them out of view.
location of each light and
identify which deck cylinders
will need to be drilled. Then,
using a spade bit or hole
saw, drill out a ¾" (19.05
mm) hole in each selected
cylinder (Figure 28). Do NOT
modify areas labeled "DO
NOT DRILL."
the top of the drilled cylinder
(Figure 29) and out through
the access panel. Be sure to
make all necessary connections outside of the basin.
CAN (866) 766-3426
Figure 28
Figure 29
15

Publicité

loading