Télécharger Imprimer la page

Mirolin BD44 Instructions D'installation page 7

Masquer les pouces Voir aussi pour BD44:

Publicité

Les langues disponibles

Les langues disponibles

STEP 11: Make sure to push the left (B9L) and right
(B9R) guides all the way to the wall jambs.
Using a 1/8" bit, drill holes in each guide.
Screw guides in place using # 6x½" PH screw (B13).
B9L
B9C
CENTER ON SILL
STEP 13: Ensure the Wall Jambs (B1) are plumb.
Adjust by turning the Adjustment Nut (B11b) with a
Phillips screw driver through the holes in the Wall
Jambs (B1.)
STEP 15: Fasten the Wall Jamb (B1) using #10 - 3"
Screws (B12) into the wall.
B9R
LEVEL
STEP 12: Place Header (B6) onto Wall Jambs (B1).
(If required, you can trim accordingly).
STEP 14: Using a 1/8" drill bit, drill pilot holes
through the pre-drilled holes into the shower wall.
STEP 16: Fasten Door Stops (B8a) to the Wall
Jambs (B1), using # 6x½" PH screws (B13).
7

Publicité

loading

Ce manuel est également adapté pour:

Bd48Bd53Bd55Bd56Bd57Bds60 ... Afficher tout