Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EPCO-...-KF
Installation of the payload
Note
If pins strike against the yoke plate, the mechanical connection can be destroyed
• Push a metal plate between the yoke plate and the housing as a counterholder.
• Then press the required pins into the yoke plate.
• Place the centre of gravity of the payload as close as pos­
sible to the centre of the yoke plate.
• Attach the payload to the yoke plate in the retracted end
position.
The piston/guide rods bend, depending on the payload
(è Appendix, Characteristic curves).
Size
Thread
Max. tightening torque
Centring holes
Tab. 2
5

Fault clearance

Malfunction
Running noises or
vibrations
Tab. 3
Festo – EPCO-...-KF – 1506NH English
16
M4 / M6
[Nm]
2.5 / 6
 5H7 /  7H8 /  9H8
[mm]
Possible cause
Guide unit incorrectly mounted
(tension)
Fig. 3
25
40
M5 / M6
4 / 6
 7H8 /  8H7 /
 9H8
Remedy
Align guide unit and electric
cylinder again (è Mounting
instructions)
11

Publicité

Table des Matières
loading

Table des Matières