Harbor Breeze 80210 Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9
pop out the first wiring access slug. Use second if
needed.
For New Construction - attaching to joist go to step A11, page 5
For New Construction - suspended between joists go to step B11, page 8
For Existing Construction - accessible from above go to step C11, page 11
For Existing Construction - accessible only from below go to step D11,
New Construction – attaching to joist
A11
5/8
1/2
position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
E
Choose Installation Option
page15
E
5
43033-01 01/24/2008
10
Insert the strain relief into the housing and
secure with the washer.
A12
Screw pre-loaded screws into joist or framing.
C
B

Publicité

Table des Matières
loading

Table des Matières