Install The Finished Wall; Verify Depth And Install The Nipple - Jacob Delafon E8002 Notice Technique

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

• To adjust the pipe depth, use a level or other straight edge to line up the edge of the
plaster guard with the front face of the studs.
• Install appropriate backing and strap the pipes at the adjusted depth.

4. Install the finished wall

4'' (10.2 cm) Min –
4-1/4'' (10.8 cm) Max
Cutout
• Use a water-resistant wall board.
• Cut out a 4" (10.2 cm) to 4-1/4" (10.8 cm) square at each tile
installation location.
• Install the finished wall material.

5. Verify depth and install the nipple

• Remove the nipple.
REMARQUE : The minimum distance between the face of the tee/elbow and the sur-
face of the finished wall should be 2-1/4" (5.7 cm).
• Measure the distance from the face of the tee/elbow to the surface of the finished
wall. Make any adjustments as needed. Install the nipple.
Standard wall installation
Align mark with the front of
the stud face.
All installations
4'' (10.2 cm) Min –
4-1/4'' (10.8 cm) Max
Tee or elbow
2-1/4'' (5.7 cm) Min
English
Finished wall
Cutout
Nipple
4'' (10.2 cm) Min –
4-1/4'' (10.8 cm) Max
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E8003

Table des Matières