6. Installing of the synchronization ropes
a. Bring the synchronization ropes over the pulleys
b. Lubricate the bolts of the pulleys, as is specified in the lubrication schedule.
c. Fit the pulleys and fix and SECURE THEM WITH THE DELIVERED SEEGER RINGS
d. Install the synchronization ropes as shown in the next drawings.
By XL -Version
By H-Version
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-04
Manufacturer ATH-Heinl GmbH & CO.KG
- 31 -