Electrical Connection - De Dietrich AC6 Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2

Electrical connection

2.1
GT... 110 DIEMATIC - GT... 120 B/D + CF 140 EB
1. Disconnect connector 4 with female plug A from the connection terminal block C of the flue gas thermostat. Disconnect connector 3 with
female plug B from the connection terminal block C of the flue gas thermostat.
2. Reconnect connector 4 with female plug A onto the connector socket D. Reconnect connector 3 with female plug B onto the connector
socket E.
3. Disconnect the supply harness G from the terminal ALI of the terminal block for the boiler F. Disconnect the accelerator H from the terminal
A of the terminal block for the boiler F.
4. Reconnect the supply harness G onto the terminal block C. Reconnect the accelerator H onto the terminal block C. Connect the wires of
connector 4 plugs A to terminals
the wires of connector 3 plugs B to terminals ALI (black wire on L, blue wire on N and green/yellow wire on
5. Withdraw the link I from the terminals CS of the boiler terminal block F. Connect the 2 wires from the flue gas thermostat harness J. The
wires are interchangeable.
Note: The accelerator cable supplied with the boiler CF 140 EB is not used. Pull out the cable.
25/06/2012 - 8490-4007-000-01
A (black wire on L, blue wire on N and green/yellow wire on
AC6
8800N052-B
) of the boiler terminal block F. Connect
) of the boiler terminal block F.
15

Publicité

Table des Matières
loading

Table des Matières