Item:
LVT2-20-CS
LVT4-40-40K
LVT4-50PCS
LVT4-50PCS-EM
LVT4-50PCS-MS
LVT8-70PCS
LVT8-70PCS-MS
LVT-ANGL-MNT
F-LED-CABLE 2PK
INSTALLATION INSTRUCTIONS
D. Mounting with Junction-box (sold separately)
Parts List
Mounting Plate
(sold separately)
EV pad
(sold separately)
Sleeve Anchor*4
Self-Tapping Screws*4
1
Junction Box
Junction Box
Plate
Self-Tapping
Screw
Mounting Bracket
2
Lock Clips
3
4
Wire-nuts
5
www.topaz-usa.com | 800.666.2852 | ©2022 Southwire Company, LLC. All rights reserved.
LVT4-40-50K
LVT4-50PCS-EMS
LVT8-70PCS-EM
LVT-JBOX-MNT
LED LINEAR VAPOR TIGHT
Mounting Surface
Mounting Plate
Sleeve Anchor
Self-Tapping Screw
Threaded Plug
EV Pad
Single CCT Junction Box
Plate (sold separately)
PCTS Junction Box Plate
(sold separately)
Self-Tapping Screws*4
(sold separately)
1.
Use screws to fix the mounting plate and junction-box plate to
the junction box. See Figure 1
Note: Choose the propper Junction Box Plate for your fixture (Singel
CCT or PCTS). See Part List.
2.
Drill holes in the wall/ceiling between 30.5" and 36.5" apart, install
mounting clips to wall with screws and plastic sleeve anchors. See
Figure 1.
3.
Open the lock clips and center cap with screwdriver. See Figure 2.
4.
Take out the input wire from fixture, then secure the lock clips
back. See Figure 3.
5.
Pass the input wires through EV Pad as shown in the figure, then
connect the input wires to supply wires in the junction box with
wire nuts as per wiring diagram. then clamp the fixture on the
mounting bracket, get the EV pad and the junction box plate are
completely coincident. See Figure 4.
6.
Turn on the lights after installation. See Figure 5.
Mounting Bracket*2