Item:
LVT2-20-CS
LVT4-40-40K
LVT4-50PCS
LVT4-50PCS-EM
LVT4-50PCS-MS
LVT8-70PCS
LVT8-70PCS-MS
LVT-ANGL-MNT
F-LED-CABLE 2PK
INSTALLATION INSTRUCTIONS
B. Suspended Installation (sold separately)
Parts List
1
Sleeve Anchor
Wire Rope Anchor
Self-Tapping Screw
Wire Rope
2
Mounting
Bracket
3
4
www.topaz-usa.com | 800.666.2852 | ©2022 Southwire Company, LLC. All rights reserved.
LVT4-40-50K
LVT4-50PCS-EMS
LVT8-70PCS-EM
LVT-JBOX-MNT
LED LINEAR VAPOR TIGHT
Sleeve Anchor*2
Self-Tapping Screws*2
Mounting Bracket*2
1.
Drill 2 holes in the ceiling and install a sleeve anchor in each hole.
2.
Secure the wire rope anchors to the ceiling using the supplied self-
tapping screws. See Figure 1.
3.
Secure the wire rope to the wire rope anchors.
4.
Hang the mounting clip to the hook of the suspension cable. See
Figure 2.
5.
Push the fixture into the hanging mounting clips. See Figure 3 and
Figure 4.
6.
Turn on power.
Wire Rope*2
(sold
separately)