Installation - AquaScape 83013 Instructions Et Entretien

Masquer les pouces Voir aussi pour 83013:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

SUPPORT VIDEO LINK:
aquascapeinc.com/backyard-waterfall-landscape-fountain-kit
STEP 1
CAREFULLY REMOVE CONTENTS FROM THE BOX
STEP 2
SELECT YOUR LOCATION
• Set the AquaBasin 45 in
the desired location. Avoid
selecting a location that
is an unused area of the
property. We recommend
locations near decks or
patios, so it is easy to sit
and relax next to the water
feature. Make sure the
waterfall faces the viewing
area. If possible, also make the waterfall visible from a
regularly used window or patio door to provide enjoyment
from both inside and outside (Ex. 1).
• Position the basin with the pump access panel opposite
of the location where the waterfall will enter the basin
(Ex. 2). Setting the AquaBasin in a diagonal orientation will
maximize the usable space. Be sure to provide enough
space to build the waterfall behind the location of the
AquaBasin.
Waterfall Spillway
AquaBasin
45
®
Pump Access
Panel
STEP 3
MARK OUT THE AREA
• Using a can of brightly colored spray paint, trace around
the basin to outline the area that is to be excavated (Ex. 3).
aquascapeinc.com |
CAN (866) 766-3426 |
• Next, mark out the channel for the flex PVC pipe, leading
from the pre-drilled bulkhead port to the opposite corner
of the basin where the waterfall will begin (Ex. 2).
STEP 4
EXCAVATE THE BASIN AND PLUMBING LINE
• Using the traced area as a
guide, dig the hole for the
Ex. 1
AquaBasin roughly to 17"
(43 cm) deep (Ex. 4). The
additional depth will allow
the basin to sit flush with
the ground once gravel
and rocks are added. Use
the excess soil to create
elevation for the waterfall
or the berm around the
waterfall.
• Continue by excavating
the area marked for the
pipe. In the area closest
to the pre-drilled bulkhead
port, dig the trench to
approximately 7" (18 cm)
deep (Ex. 5). This will allow
sufficient space for the pipe and plumbing.
• The remainder of the trench only needs to be dug deep
enough to provide enough space for the pipe to travel
beneath the soil to the Waterfall Spillway. Use (Ex. 2) as a
reference for pipe placement.
STEP 5
BULKHEAD INSTALLATION
• The included 2" bulkhead contains a rubber gasket and a
plastic washer. When installing the bulkhead, make sure the
rubber gasket is installed on the inside of the basin and the
rigid plastic washer is installed on the outside of the basin to
Flexible PVC Pipe
ensure a watertight seal (Ex. 6).
Ex. 2
Rubber Gasket
US (866) 877-6637
Ex. 3
Ex. 4
Ex. 5
Plastic Washer
Ex. 6
5

Publicité

Table des Matières
loading

Table des Matières