CRAFT+MAIN COVE Instructions page 9

Porte coulissante de douche et de baignoire de s-curve
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE / STEP 13 / STEP 14
Install towel bars (5).
13
Position panel guide in center of bottom track. Drill two 1/8" holes through screw holes in guide
14
and into bottom track. Position panels in guide as shown in inset drawing and attach guide to
bottom track using 3/8" pan head screws.
3/8" PAN HEAD SCREW
- 8 -

Publicité

Table des Matières
loading

Table des Matières