CRAFT+MAIN COVE Instructions page 6

Porte coulissante de douche et de baignoire de s-curve
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE / STEP 5
Run a thin bead of silicone caulk down the entire length of both bottom ledges on the bottom track.
5
Place the bottom track into position and press down firmly along the length of the track.
1 1/2" PAN HEAD SCREW
INSTALLATION PROCEDURE / STEP 6 / STEP 7
6
Push wall plugs into holes drilled in Step 3 and tap them in with a rubber mallet.
NOTE: If you are installing on fiberglass or acrylic, skip this step and discard the wall plugs.
Dab silicone into all 3 holes on each side. Run 1 1/2" pan head screws through wall bumper and use
7
to attach wall jamb to wall in top and bottom holes only on both sides.
- 5 -

Publicité

Table des Matières
loading

Table des Matières