Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

ShelterCoat
11 ' W x 10 ' H Peak
TM
Custom Garage Program
+
/
-
18"
/
45 cm
7
16 "
Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored.
THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE.
Before you start: 3 or more individuals recommended for assembly.
Assembly time is dependent upon the length of your building.
Allow approximately 15 minutes for every foot in building length.
1-800-524-9970
Canada:
1-800-559-6175
150 Callender Road
Watertown, CT 06795
www.shelterlogic.com
4/8/21
Page 1
05_GP-AA-XXXXXXA-011XXX10_C0

Publicité

Table des Matières
loading

Sommaire des Matières pour ShelterLogic ShelterCoat 11'W x 10'H Peak

  • Page 1 Before you start: 3 or more individuals recommended for assembly. Assembly time is dependent upon the length of your building. Allow approximately 15 minutes for every foot in building length. 1-800-524-9970 Canada: 1-800-559-6175 150 Callender Road Watertown, CT 06795 www.shelterlogic.com 4/8/21 Page 1 05_GP-AA-XXXXXXA-011XXX10_C0...
  • Page 2: Care And Cleaning

    árboles, excremento de animales/aves y nieve liviana. Asegúrese de ® and light snow. Please insure this ShelterLogic Corp. structure que esta estructura de ShelterLogic ® Corp. Esté debidamente fi jada al ® assurer que la structure du ShelterLogic Corp. est bien assemblée, que is properly anchored, the cover is kept tight and free of snow and suelo, que la cubierta se mantenga tirante y libre de nieve y escombros.
  • Page 3 Au moment de la réception, si ce produit ou tout élément associé est défectueux ou manquant, ShelterLogic Corp. réparera ou remplacera, à sa discrétion, le produit ou ®...
  • Page 4: Guide D'ancrage

    ANCHOR GUIDE / GUIDE D’ANCRAGE GUÍA DEL ANCLA Tous les abris et tentes ShelterLogic viennent Los refugios, los toldos y los garajes de ShelterLogic shelters, canopies and garages avec une trousse d’ancrage d’« installation » de ShelterLogic vienen con un básico “instalar” el come with a basic “install”...
  • Page 5 11'W x 10'H Peak Style Frame Assembly Please read and understand instructions completely before assembly. Lay out frame parts as shown. 21/22 Top Rail Middle Rib 21/22 End Rib 21/22 Wind Brace End Rib Cover Rails Side Rail Assembly Mfg. Assembly Mfg.
  • Page 6 NOTE: FRAME EXTENSION KIT Your model may have more middle ribs than shown in the illustration on page 3. You will receive one extra rib for every extra 4 ft. of building length that you purchase. The basic frame assembly will remain the same. The cover will be the correct size for the length of the building you purchased.
  • Page 7 4. CONNECT THE FRONT END RIB TO THE MIDDLE RIB A. With help, move the front end rib into the desired staked area. B. Place the ShelterLock (800260) on the upright as shown in Fig. 5. ® C. From the outside of the rib insert the bolt through the upright and then through the ShelterLock ®...
  • Page 8 9. Secure the cable with the clamps provided. If the ground is too hard, dig a hole with a shovel or post hole tool. Optional: Fill with cement. 15" Augers are for temporary use only. For best results, ShelterLogic recommends the Easy ® Hook ™...
  • Page 9: Important

    9. DOOR AND SOLID END PANEL INSTALLATION A. Hold end panel at the top center with white inner surface facing inside of the shelter. (If you purchased the white cover, the inner face has the visible weld seams at the webbing pocket.) Wrap the edges of the fabric panel around the end rib.
  • Page 10 D. Disassemble cover rails and slide through fabric pockets at each leg and reattach with clamps to each leg. Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts completely. E. Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight. NOTE: The ShelterLogic logo should ®...
  • Page 11 Avant de commencer : Il faut 2 personnes ou plus pour le montage qui prend environ 3 heures. Le temps de montage dépend de la longueur de votre bâtiment. Veuillez prévoir environ 15 minutes pour chaque pied de longueur du bâtiment. 1-800-524-9970 Canada: 1-800-559-6175 150 Callender Road Watertown, CT 06795 www.shelterlogic.com Page 11 05_GP-AA-XXXXXXA-011XXX10_C0...
  • Page 12 Abri à toit pointu, 3,4 m x 3 m - Assemblage de l'armature (larg.) (haut.) Veuillez lire et vous assurer de bien comprendre TOUTES les instructions avant d'entreprendre l'assemblage. Étalez les pièces de l'armature, comme le montre l'illustration. Tube 21/22 supérieur Nervure centrales...
  • Page 13: Assemblez Les Nervures D'extrémité

    REMARQUE: NÉCESSAIRE DE RALLONGE D'ARMATURE Votre abri peut comporter davantage de nervures centrales que l'illustration de la page 11. Vous recevez une nervure additionnelle pour chaque section supplémentaire de 1,2 m. L'assemblage de l'armature de base reste le même. La taille de la toile correspondra à la longueur de l'abri. Fig.1 1.
  • Page 14: Fixez La Nervure Avant Aux Nervure Centrales

    4. FIXEZ LA NERVURE AVANT AUX NERVURE CENTRALES A. Avec l'aide d'une autre personne, placez la nervure avant à l'emplacement piqueté. B. Placez la pièce ShelterLock (800260) sur le montant comme le montre la Fig. 5. C. À partir de l'extérieur de la nervure, insérez le boulon dans le montant, puis dans la pièce ShelterLock ®...
  • Page 15: Installez La Traverse Supérieure

    Si le sol est trop dur, creusez un trou à l’aide d’une pelle ou d’une bêche-tarière. Option : Remplissez le trou de ciment. Les tarières de 15 po sont destinées à un usage temporaire seulement. Pour de meilleurs résultats, ShelterLogic recommande d’utiliser les ancrages Easy ® Hook , soit un pour chaque pied de l’armature, afin...
  • Page 16: Installation Des Panneaux De Porte Et De Bout

    9. INSTALLATION DES PANNEAUX DE PORTE ET DE BOUT A. Tenez le panneau en haut et au centre avec la partie blanche vers l’intérieur de l’abri. Entourer le bord de la toile autour de l’ossature et passez les tubes au travers de la fente déjà coupée dans la toile. B.
  • Page 17: Installez La Toile Et Les Rails De Toile

    E. Vérifiez et resserrez les cliquets ainsi que les tubes de couverture de façon mensuelle pour s'assurer que la couverture soit bien tendue. REMARQUE: Le logo ShelterLogic ® doit être orienté comme montré.

Table des Matières