IMPORTANT: THIS PRODUCT MUST BE INSTALLED BY A
1. Unscrew the 4 cover screws.
2. Secure the sFF4 to the wall using the included hardware (#8 wood screws in
keyhole shaped mounting holes).
3. Use the correct size wire for your application. Please check local electrical
codes for wire size requirements. Carefully strip the 2 power wires
approximately 1''. Pass the stripped and copper wires through the largest
strain relief located on bottom wall of enclosure.
Insert small flat screwdriver at 45° into
4.
square hole of gray spring terminal, pry tool
downward to open contact, insert
appropriate wire (see Note 1 below ) then
release tool. Tighten up wire connectors
(strain relief).
Note 1. Hook up 240V wires as follows:
Black wire to TB2 connector Terminal L1
•
Red wire to TB2 connector Terminal L2
•
White wire to TB2 connector Terminal N
•
Copper wire to GROUND LOG located on bottom wall of enclo-
•
sure, next to metallic wire connectors.
4
INSTALLATION GUIDE
LICENSED ELECTRICIAN ONLY