Cable Installation - Preparation - Leviton 5R1UD-S08 Mode D'emploi

Boîtiers optiques opt-x hdx
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CABLE INSTALLATION - PREPARATION

Top View: Tray to Front
NOTE: Tray in forward position, covers
are removed for clarity.
Pictured: Removable tray to facilitate
termination
Page 6 of 30
COMMENTS:
• Route cable to tray through grommet on the opposite
side of slide tray tie down point
• Assure cable slack for tray movement.
• Recommended trunk breakout length is 36 inches.
• A minimum of 20 inches of free slack is required to each
cassette for bend radius compliant accessibility from the
front side.
To remove tray from enclosure, slide tray fully forward
stop position. Press release lever and slide tray out to
remove.
Caution - Damage may occur to
beyond the stop point when loaded.
Tray Release
To Remove a tray: (see diagram)
1. Pull the tray forward to the stop point
2. Press the release lever toward the outside of the
enclosure and remove the tray from the tray
guides.
To Install a tray:
A. Insert the tray into the target position
B. Slide the tray inward until the
reached.
C. Press the release lever toward the outside of the
enclosure and continue sliding the tray inward to
the fully enclosed position.
cabling if tray is removed
stop point is

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5r2ud-s165r3ud-s245r4ud-s32

Table des Matières