Télécharger Imprimer la page

Please Read Immediately; Important Information; Legal Regulations And Guidelines - Dimplex HWK 332 Econ5S Instructions D'installation Et D'utilisation

Tour hydraulique combinée avec gestionnaire de pac
Masquer les pouces Voir aussi pour HWK 332 Econ5S:

Publicité

Les langues disponibles

Les langues disponibles

HWK 332 Econ5S
1
Please read
immediately

1.1 Important information

ATTENTION!
Before opening the device, ensure that all circuits are powered down.
ATTENTION!
If the heat pump or circulating pumps are controlled externally, an flow
rate switch is required to prevent the compressor from being switched on
when there is no volume flow.
ATTENTION!
The hydro tower is to be fixed to the transport pallet with screws.
ATTENTION!
The communication cable is necessary for the function of air-to-water
heat pumps in outdoor installation. It must be shielded and laid
separately from the mains cables. It is connected to N1-J25. For further
information, see electrical documentation
ATTENTION!
Work on the system must only be performed by authorised and qualified
after-sales service technicians.
The operational reliability of the safety valve should be checked
at regular intervals. We recommend having an annual service in-
spection carried out by a qualified specialist company.
The outflow from the safety valve should visibly flow into a waste
water drain.
The installer of the heating system is responsible for checking
whether an additional expansion vessel is required.
Operating the system in a sensible way can provide significant
energy savings. The heating water temperature should be as low
as required during heat pump operation. The planner of the heat-
ing system is responsible for determining the system tempera-
ture.
When installing an underfloor heating system, a sensible value
for the maximum flow and return temperature should be set on
the heat pump manager. The position of the temperature sensor
is important in this regard.
EN-2
1.2 Legal regulations and
guidelines
This heat pump is designed for use in a domestic environment
according to Article 1, Paragraph 2 k) of EC directive 2006/42/EC
(machinery directive) and is thus subject to the requirements of
EC directive 2006/95/EC (low-voltage directive). It is thus also in-
tended for use by non-professionals for heating shops, offices
and other similar working environments, in agricultural establish-
ments and in hotels, guest houses and similar / other residential
buildings.
The construction and design of the hydro tower complies with all
relevant EU directives, DIN and VDE regulations (see CE de-
claration of conformity).
When connecting the hydro tower to the power supply, the rele-
vant VDE, EN and IEC standards must be fulfilled. Any further
connection requirements stipulated by the mains supply network
operator must also be observed.
When connecting the heating system, all applicable regulations
must also be adhered to.
The current valid regulations must be complied with when con-
necting the heating system. The local regulations for the drinking
water supply must also be complied with when connecting the
device to the drinking water supply.
Persons, especially children, who are not capable of operating
the device safely due to their physical, sensory or mental abilities
or due to their inexperience or lack of knowledge, must not oper-
ate this device without supervision or instruction by the person in
charge.
Children must be supervised to ensure that they do not play with
the device.The communication cable is necessary for the func-
tion of air-to-water heat pumps in outdoor installation. It must be
shielded and laid separately from the mains cables. It is con-
nected to N1-J25. For further information, see electrical docu-
mentation
452162.66.10 · FD 9504

Publicité

loading

Ce manuel est également adapté pour:

452162.66.10