Technical Data; Before Putting The Equipment Into Operation; Mains Connection - EINHELL GE-SP 750 LL Mode D'emploi D'origine

Pompe submersible
Masquer les pouces Voir aussi pour GE-SP 750 LL:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
Anleitung_GE_SP_750_LL_SPK1__ 19.08.13 10:13 Seite 10
GB
Please note that our equipment has not been
designed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.

4. Technical data

Mains connection

Power rating
Max. pumping rate
Max. delivery head
Max. immersion depth
Max. water temperature
Hose connection
Max. size of foreign bodies:
Switching point height: ON
Switching point height: OFF
Min. extraction height:
Protection type:
5. Before putting the equipment into
operation
5.1 Fitting the carry handle (Fig. 2/3)
Connect the carry handle (1) to the pump (Fig. 2)
n
Secure the carry handle (1) with the fastening nut
n
(3) (Fig. 3).
5.2 Installation
The equipment can be installed either:
Stationary with rigid tubing
n
or
Stationary with a flexible hose line
n
Note!
When installing, never hang the equipment by the
discharge line or by the power cable. The equipment
must be hung up with the provided carry handle or it
must rest on the bottom of the shaft. To ensure that
the equipment works properly, the bottom of the shaft
always must be free of sludge and other
accumulations of dirt. If the water level is too low, the
sludge in the shaft can quickly dry out and hinder the
equipment from starting. It is necessary therefore to
check the equipment regularly (carry out trial start-
ups).
10
Note:
The pump shaft should measure at least
40 x 40 x 50 cm so that the floating switch can move
freely.
5.3 Mains connection
The equipment you have purchased comes with an
earthing-pin plug. The equipment is designed for
connection to a socket outlet with earthing contact for
230 V ~ 50 Hz. Make sure that the socket-outlet is
230V ~ 50 Hz
sufficiently fused (at least 6 A) and in good working
750 W
order. Insert the power plug in the socket-outlet and
the equipment is ready for operation.
15,000 l/h
10 m
Important!
To rule out danger, this work must be left strictly to a
5 m
specialist electrician or Customer Service.
35 °C
ca. 42 mm (G 11/4) AG
6. Operation
Ø 5 mm
max. approx. 12 cm
You can put the equipment into operation after you
min. approx. 3 cm
have thoroughly read the installation and operating
2 mm
instructions. Pay attention to the following points:
Make sure that the equipment is set up securely.
n
IPX8
Check that the discharge line is fitted correctly.
n
Make sure that the electrical connection is 230 V
n
~ 50 Hz.
Check that the electrical socket-outlet is in good
n
working order.
Make sure that no moisture or water can ever
n
reach the power connection.
Make sure that the equipment does not run dry.
n
Function of the integrated floating switch
Automatic mode:
Selector switch (A) must be in the lower position
during automatic mode (Fig. 4).
This activates the integrated floating switch. The
height of activation is approximately 12 cm. The
equipment switches off again when a height of
approximately 3 cm is reached.
Manual mode/shallow water:
Selector switch (A) must be in the upper position to
operate manually or in shallow water (Fig. 5). This
bridges the integrated floating switch so that the
equipment runs continuously. Water can be pumped
down to 2 mm in manual mode.
Please note:
The depth of water must be at least 50 mm before the
equipment can be run in manual mode!

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

41.706.66

Table des Matières