Step 1: Preparation - weBoost Connect 4G-X Mode D'emploi

Masquer les pouces Voir aussi pour Connect 4G-X:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

______

Step 1: Preparation

You Will Need (tools not included)
Make sure the following materials are prepared and ready for your installation.
2 to 3 hours
2 people (a person to help with antenna calibration)
NOTE: These instructions will walk you through a "soft" install process to fi nd the
optimal locations for the Inside and Outside Antennas, then through the process of
the permanent installation.
2
Ladder
Phillips-head screwdriver
10mm open-end wrench or adjustable wrench
Drill (if routing cable through wall)
Mounting Option
A
existing pole
Recommended: Power Strip with surge protection
CELL PHONE SIGNAL BOOSTER
: 1-2" diameter pole (#901117) or an
CONNECT 4G-X

Publicité

Table des Matières
loading

Table des Matières