Use:
- The size of the shower system cannot be changed.
- The kind of utilization of the shower space (splash protection, move-
ment area, etc.) is to be considered.
- For the installation of the shower system a level, clean, solid surfa-
ce free of vibrations and suited for fastening with Profi-Flex fast tile
adhesive must be available.
- The correct fitting of the discharge element is to be checked.
- The shower system is in general wheelchair-accessible.
- Suitable only for use indoor.
The relevant processing guidelines of all trades must be
observed.
Remove protective foil after having tiled the shower system.
When applying the tile adhesive to the back, make sure to
protect the Loft surface by laying it face down on cardboard.
For installation substructure elements (not included in supply,
1
see figs. 7a to 9a) or a cast screed base (see figs. 7b to
9b) are to be used. The height of the substructure element/
screed base is to be selected according to the difference in
height between the raw floor and the room flooring (see also
installation examples).
Edge insulation strips are to be provided locally.
2
Apply tile adhesive to both sides. The channels on the under-
3
side of the Loft should be left clear.
The drain fitting must possibly be lined with suitable sound
4
absorbing material.
After the installation of the drain fitting, a leakage test must
5
be carried out.
The processing instructions of the sealing system are to be
6
observed.
Fold the corners of the sealing tape at the premarked points.
7
The sealing tape and the resulting overlaps must be completely
sealed with sealing compound.
Give the care instructions to the end customer.
Example for installation with Poresta
Mounting height/finished floor level
Poresta
Loft
®
2 layers of tile adhesive
Poresta
BF substructure element (X)
®
Installation example with screed base (Y):
Mounting height/finished floor level
Poresta
Loft
®
1 layer of tile adhesive
Screed base (Y)
Poresta
®
BF substructure element (X):
®
120 mm
- 50 mm
-10 mm
= 60 mm
120 mm
- 50 mm
- 5 mm
= 65 mm
Loft