Preparation; Filling The Water Tank - Beko CEG 3192 B Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
4

Preparation

4.1 Installation
Remove any protective films, stickers and any other packing material on the appliance.
150mm
150mm
150mm
Choose a safe and stable surface with an
easily reachable power supply and allow
minimum distance from the sides of the
machines.

4.2 Filling the water tank

About the protect program: If the water tank is not fully placed into the machine,
a protection mode will be activated in 15 seconds during brewing process. Hot water button
will lights on control panel.
1. Make sure that the water tank is fully inserted into the machine.
2. Press the hot water button. After the hot water is dispensed, the machine will be in
standby condition.
WARNING: When
Lift the water tank by using the lid as
the handle.
Fully Automatic Coffee Machine / User Manual
150mm
150mm
Insert the external drip tray. Make sure it
is inserted correctly.
is flashing, the water tank is at a low water level and requires filling.
Take the water tank out.
Unwind and straighten the power cord
and insert the plug into the socket loca-
ted on the back of the machine. Insert
the other end of the power cord into a
wall socket with suitable power voltage.
Rinse the water tank with fresh water
and then fill the tank to the Max level
and place it back into the machine. Make
sure it is fully inserted.
.
11 / EN

Publicité

Table des Matières
loading

Table des Matières