Kohler K-6284 Guide D'installation Et D'entretien page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6" (152 mm)
Screws
Inlet
Ø 2"
(51 mm)
6. Secure the Top of the Carriage
Drill pilot holes at the lag bolt locations.
Install two 6" (152 mm) long support 2x4's, located at the top of
the carriage, aligned with the mounting holes, 1-5/8" (41 mm) in
from the front edge of the studs.
Secure the carriage to the support studs using 2" (51 mm) long
(minimum) lag bolts (not supplied), one on each side.
At the location of the inlet, drill a 2" (51 mm) hole.
Connect the Power - Bidet Seat Installations
WARNING: Risk of personal injury. Disconnect the power
before connecting the wires.
CAUTION: Risk of personal injury. The electrical outlet
must be connected to a GFCI or RCD protected circuit or an
accessible Ground-Fault Circuit-Interrupter (GFCI) or
Residual-Current Device (RCD) must be installed.
NOTE: This step is only needed if the electrical box was installed in
the "Prepare the Carriage" section.
Connect the power following all applicable codes.
Kohler Co.
2x4
1-5/8"
(41 mm)
11
Lag Bolt
1142998-2-D

Publicité

Table des Matières
loading

Table des Matières