Zoeller QWIK JON PREMIER 201 Instructions D'installation page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 4
1
Cut and dry-fit the pipe and fittings as required for 1" (DN25) diameter
discharge pipe (may be reduced to 3/4" [DN20] diameter if local code
allows it.)
2
While dry-fitting the discharge pipe, position and mark the location of the
pump unit discharge fitting.
3
Cut and dry-fit 1-1/2" (DN40) vent pipe as required to ensure that the vent
pipe does not interfere with other components. Make the connection to
the pump unit with the provided street elbow. A 2" x 1" 90° discharge
fitting has been provided.
Proper venting is required.
4
Temporarily set the toilet in place to check that there is no piping interfer-
ence. Remove the toilet and set it aside.
5
Clean, prime and solvent weld the discharge piping and pump unit
discharge fitting.
1
15
8
( 384 mm )
PIPING
3
14
8
( 365 mm )
© Copyright 2022 Zoeller
When applying solvent weld to discharge fitting, ensure
that none gets into the check valve assembly. Pay close attention to the
proper alignment of the discharge fitting previously marked.
6
For markets requiring a pipe vent, clean and solvent weld the vent piping
as required for proper venting.
Note: Adding other bathroom fixtures - The Qwik Jon
to accept additional bathroom fixtures utilizing the two side inlets. These
inlets can be attached via the 2" NPT (outside diameter) or the 1-1/2"
(DN40) slip (inside diameter). These inlets must have the inner portion
drilled out using a 1-3/4" (44 mm) hole saw. This is to ensure there is no
leakage problems from inlets not in use. When utilizing side inlets, install a
check valve on the incoming line.
Once the side inlet opening has been drilled out, remove
burrs and rough edges to avoid the potential for clogging.
®
Co. All rights reserved.
- 7 -
Premier is designed
®
1
3
Ø
2
( 89 mm )
7
( 178 mm )

Publicité

Table des Matières
loading

Table des Matières