Plan your new installation carefully.
Floor:
The floor should be structurally sound and level within 1/8" (3
mm). If the floor is not level, use hydraulic cement or similar
material to level to the floor.
Water:
A water supplt will be needed to operate the toilet. Usually a 1/2"
(DN15) line with a shut-off valve is sufficient.
Electrical:
A receptacle of the appropriate voltage will be needed to supply
electrical power to the pump.
Sewage:
Access to a sewage line is required. The Qwik Jon
requires a 1" (DN25) (or 3/4" [DN20] if local code allows it)
sewage discharge line to connect to an existing sewage line. A
ball or gate value should be installed in the discharge line.
Vent:
Access to a vent pipe is required in some markets. The use of a
mechanical vent system is NOT recommended as the toilet will
not flush.
NOTE:
If a built-in installation is to be used, locate the pump unit in an
area that will allow access to the pump and switch.
STEP 2
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do not puncture the pump unit!
Level the pump unit to within
PREMIER QUICK REFERENCE GUIDE
®

LOCATION SELECTION

LEVELING OF PUMP UNIT
1/8"
(3 mm)
using hydraulic cement or similar material.
© Copyright 2022 Zoeller
OUTLET
Premier
®
QWIK JON
MODEL 201
1. Always disconnect power source before attempting
to install, service, or maintain the system.
2. Never handle a pump with wet hands or when
standing on wet or damp surface or in water.
Fatal electrical shock could occur.
Co. All rights reserved.
®
- 5 -
VENT
DISCHARGE
PIPE
PIPE
BALL OR GATE VALVE
SOLD SEPARATELY
WATER
SUPPLY
LEVEL FLOOR
PREMIER
®
SK2588

Publicité

Table des Matières
loading

Table des Matières