STEP 3
(STAND-ALONE INSTALLATION)
1
Position the pump unit a minimum of 1/8" (3 mm) from the wall with the
inlet facing away from the wall. Attach the bellows to the inlet using the
worm drive clamp provided.
2
Place the toilet in front of pump unit aligning the discharge of the toilet with
the inlet of the pump unit. Make sure that the bellows will bridge the gap
adequately for final installation. The toilet tank should be a minimum of
1/2" (13 mm) from the wall.
3
Lightly mark the locations of the pump unit, toilet and closet bolt locations
on the floor. Lightly mark the wall with the height of the pump unit and the
bottom and sides of the toilet tank to ensure against interference from
pipe runs later.
4 Remove the toilet from the pump unit and set it aside.
Connect the rear discharge toilet to the front inlet of the Qwik Jon® Premier via hose clamps. Ensure the connec�ons are
according to local, regional, and state codes.
ROUGH-IN
1
Installing the pump unit behind a wall will require an extension kit (P/N
10-2123) sold separately.
2
Place the toilet assembly a minimum of 1/2" (13 mm) from the wall and
mark the closet bolt locations on the floor.
3
Measure the appropriate length of 3-1/2" Schedule 40 PVC pipe provided
with the extension kit and cut it to length. See sketch below.
4 Set toilet aside.
ensure that toilet does not tip over and break.
© Copyright 2022 Zoeller
®
Co. All rights reserved.
- 6 -
(BEHIND THE WALL INSTALLATION)
Toilet assembly is top heavy. Take special precautions to
*These drawings are for reference only.
Exact components may differ by region.