NewAge Products PERFORMANCE PLUS CABINETRY Serie Instructions D'installation page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NEWAGE STEEL WELDED PERFORMANCE PLUS CABINETRY
INSTALL INSTRUCTIONS
2. Determine which side of the locker you would prefer to have the
butcher block top mounted to.
3. Once side location is determined place the butcher block side
support bracket on the outside of the locker by aligning the
holes in the locker with the holes in the support bracket. Ensure
the bracket is positioned with the side lip pointing up. See below
diagram.
4. Using the supplied hardware put a ¼" x 5/8" bolt through the
support bracket and then through the side of the locker cabinet.
Once through put on a large washer and a ¼" x 20 hex lock nut.
At this point the lock nuts should be only finger tight.
5. Repeat step 4 two more times for the remaining holes.
6. Once all the bolts and nuts are in place level the bracket with a
small magnetic level.
7. Once leveled using a 7/16" wrench and a 7/16" socket wrench
tighten the nuts firmly. This task may require 2 people for ease of
installation.
MOUNTING OF THE BUTCHER BLOCK TOP:
(optional, for base cabinets)
NOTE: Base Cabinet Drawers must be removed prior to
mounting butcher block top.
Pull each drawer out to full extension, simultaneously depress
the left lock down and right lock up in each slider while pulling
out the drawer. The drawer will slide out of the tracks ready to
remove. See the diagram on the previous page to note where the
locks are on the drawer slides.
1. Place the butcher block top on top of both the base cabinet .
2. Align the butcher block top so that it is flush with the side of the
base cabinet.
3. Using the supplied butcher block hardware fasten 4 - #10 x 7/8"
Phillips head screws through the cabinet top into the butcher
block top. A cordless power drill and a #2 Philips bit is required to
drive the screws into the butcher block top.
behind the side slots.
4. Put drawers back into base cabinet by aligning them with the
ball-bearing slides drawer tracks. The drawer should slide back
into place. Push the drawer fully into the cabinet, then pull it out
to full extension. If the drawer does not stop at full extension,
or feels loose, the drawer has not been put back into the drawer
slides properly. Ensure both drawer slides attached to the drawer
are running along the drawer slides attached to the frame of the
cabinet.
,
WWW.NEWAGEPRODUCTS.COM
?
need more information
try
MOUNTING OF THE BUTCHER BLOCK TOP
NOTE: Mounting of the butcher block top requires the assembly
of a base cabinet prior to the mounting of the top.
1. Place the assembled base cabinet 28" away from locker with the
butcher block support bracket.
2. Now place the butcher block top on top of both the butcher
block support bracket and the base cabinet.
3. Align the butcher block top so that it is flush with the face of the
locker.
4. Using the supplied butcher block hardware fasten 3 - #8 x 5/8"
Phillips head screws through the bottom of the support bracket
into the butcher block top. A cordless power drill and a #2 Philips
bit is required to drive the screws into the butcher block top.
INSTALLING SHELVES AND CLOSET ROD:
NOTE: Shelf must be installed level with the lock on the cabinet door
in order for lock to work.
1. Determine the placement of the shelves.
2. Tilt the shelf so that one end is higher than the other as show in
the diagram below.
3. Insert the shelf into the cabinet so that the higher end is directly
above the desired slots and push the shelf down into place
behind the side slots.
4. Raise the lower end so it is directly above the desired slots and
push the shelf down.
1 877 306 8930
U.K 0800 031 4069
or
or for
28"
for answers to commonly asKed qUestions
(optional):
.

Publicité

Table des Matières
loading

Table des Matières