Measurement Point Illumination - koban KMT-01 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

KMT-01
VOLTAGE AND CONTINUITY TESTER
R signifies that the supposed phase L1 is the actual phase L1 and the supposed phase L2 is the actual phase L2.
L signifies that the supposed phase L1 is the actual phase L2 and the supposed phase L2 is the actual phase L1.
When re-testing with exchanged test probes the opposite symbol has to be illuminated.

6. Measurement Point Illumination

Voltage testers are equipped with a measurement point illumination feature. Thus, working under bad lighting conditions
(e.g. division switch cabinets) is made easier.
Press button for measurement point illumination (11) on instrument.
52
www.grupotemper.com

Publicité

Table des Matières
loading

Table des Matières