Best WPP9 Mode D'emploi page 12

Masquer les pouces Voir aussi pour WPP9:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WIRING (WPP9IQ and WPP9IQT)
Note: This range hood must be properly
grounded. The unit should be installed by a
qualified electrician in accordance with all
applicable national and local electrical codes.
1. Remove the wiring box cover. Remove a
knockout from the wiring box (Fig.10).
2. Secure the conduit to the wiring box through a
conduit connector.
3. Make electrical connections. Connect white to
white, black to black and green to green.
4. Replace wiring box cover and screws. Make sure
that wires are not pinched between cover and
box.
ADDITIONAL EXTERNAL
BLOWER WIRING (WPP9E)
1. Run 2-wire plus ground power cable from the
exterior blower to the hood's wiring box marked
"motor connection" (Fig.11).
2. Remove the cover from the wiring box and
remove one knockout.
3. Feed 6" of cable through the knockout opening
and secure the cable to the wiring box with an
appropriate connector.
4. Make electrical connections at the hood.
Connect white-to-white, red-to-black and
green-to-ground.
5. Replace the wiring box cover and screws.
Make sure wires are not pinched between the
cover and box.
Exterior blower connection:
1. Make electrical connections at the exterior
blower (see instructions provided with the
exterior blower).
WIRING BOX
COVER
BLOWER CONNECTION AT HOOD
CONNECT:
WHITE-TO-WHITE,
RED-TO-BLACK,
GREEN-TO-GROUND.
- 12 -
FIG.10
EXTERIOR BLOWER
BOX MARKED
"MOTOR
CONNECTION"
FIG.11

Publicité

Table des Matières
loading

Table des Matières