PREPARING THE LAND
EN
In order to avoid any excess humidity in your land, you should install a draining system under the pool, and around it by building a decompression
well.
PREPARATION
or flattened, as the slightest defect may be seen. Minimum thickness 15 cm.
Wait for 3 weeks for the slab to dry completely before continuing the installation of your pool (figure 4).
The concrete slab is not included.
Ref. 788455 (E) L: 3,68 x W: 3,68 x H: 0,15 m - 2,03 m
PARTIAL OR COMPLETELY IN-GROUND INSTALLATION
Natural
Anti-roots or felt
ground
Geotextile
blanket
Layer of
30
stabilized gravel
of concrete.
3
Natural ground
Protection and
alveolar draining roll
of HDPE
Peripheral
Descompression
Watertight
drainage
wel
film
3
Film Polyane
Layer of stabilized gravel
Draining gravel
Wood frame
ø10-30
Respect the direction of the alveolar
protection roll, with the bubbles
against the wall, to allow the wood
to "breathe".
Fig. 5
Concrete
l
slab
Wood frame
Concrete slab
(mini 17 cm)
Fig. 4
Geotextile blanket
1
Fig. 6
1- Wood frame
2- Roll of alveolar protec-
tion an drainage of HDPE
2