Bticino F3N300 Manuel D'installation page 13

Table des Matières

Publicité

Rete due fasi (2BL)
In regime IT, non collegare
il secondario del TA a terra.
Two-phase network (2BL)
In IT load, do not connect
the secondary of CTs with the earth.
Réseau biphasé (2BL)
En régime IT, ne pas raccorder
les secondaires de TC à la terre.
Red bifásica (2BL)
En esquema IT, no conectar los
secundarios de los TC a tierra.
Rede bifásica (2BL)
Em regime IT, não conectar os
secundários de TC à terra.
Rete monofase (1BL)
In regime IT, non collegare
il secondario del TA a terra.
Single-phase network (1BL)
In IT load, do not connect
the secondary of CTs with the earth.
Réseau monophasé (1BL)
En régime IT, ne pas raccorder
les secondaires de TC à la terre.
Red monofásica (1BL)
En esquema IT, no conectar los
secundarios de los TC a tierra.
Rede monofásica (1BL)
Em regime IT, não conectar os
secundários de TC à terra.
Standard multifunction meter
I1
I2
I3
S1
S2 S1 S2 S1 S2
S1
P1
① Alim. Aus. / Aux. Supply: 110 ... 400 V AC
120 ... 350 V DC
② Fus.: 0.5 A gG / BS 88 2A gG / 0.5 A classe/class CC
I1
I2
I3
S1
S2 S1 S2 S1 S2
S1
P1
① Alim. Aus. / Aux. Supply: 110 ... 400 V AC
120 ... 350 V DC
② Fus.: 0.5 A gG / BS 88 2A gG / 0.5 A classe/class CC
V1 V2 V3 VN
AUX
2
1
2
L1 ( R )
L2 ( S )
V1 V2 V3 VN
AUX
2
1
2
L1 ( R )
N
13

Publicité

Table des Matières
loading

Table des Matières