KIRAMI Original Tiny S Mode D'emploi page 27

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 48
27/86
© Kirami Oy, Finland
INSTALLATION
Making the foundation
It is important to place the tub on an even surface that can bear the whole weight of the tub
(approx. 800kg). The foundation can be evened out e.g. with chips (picture below) or if you want a
more solid foundation, it can be cast of concrete or covered with slabs. When the bottom of the tub
is clearly in the air, it airs well and dries. Ensure that the tub is not covered by grass or hay, as it will
prevent the wood from breathing and will cause rotting.
Since the hot tub wall height is over 85 cm high, you should get a means of ingress (e.g. steps) to
the outside. Or install the hot tub so that the ingress is easily possible e.g. via terrace.
Note possible maintenance operation when selecting the position for the tub. It must be possible to
move the tub wherever necessary, even if it is embedded in a terrace, for example. The guarantee
will not cover any indirect costs, such as removal or construction of terraces.
INSTRUCTIONS FOR USE: Original Tiny ™ hot tubs
3 / 11
01.03.2022

Publicité

Table des Matières
loading

Table des Matières