Mirolin CD 38NA Manuel Du Propriétaire page 9

Masquer les pouces Voir aussi pour CD 38NA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 25: Insert Short Bottom Sweep Gasket Seal
(15) onto the Door Panel (8) bottom glass as shown.
STEP 27: Screw Door Handle (7) onto the door
handle studs.
STEP 29: Notch the rigid section of the Magnet Strip
(10) to match with the Bottom Gasket Seal (16)
properly.
All manuals and user guides at all-guides.com
Short Bottom Sweep
Gasket Seal
STEP 26: Insert the Door Handle (7) into the two pre-
drilled holes on the Door Panel (8). Reference Detail
View III - Handle Assembly (7) on page 4 of Exploded
View.
STEP 28: Install Magnetic Strips (10) on the Door
Panel (8) and adjoining Fixed Panel. Note: Start at the
top and work down.
STEP 30: The Magnet Strip (10) should line up as
shown. Close the door and check the magnet
alignment.
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cd 42nad

Table des Matières