Mirolin CD 38NA Manuel Du Propriétaire page 5

Masquer les pouces Voir aussi pour CD 38NA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 1: Remove the lid from box.
Remove packaging and inspect all door components
thoroughly before installation. Check to ensure all
the hardware parts are in the package.
STEP 3: Align the Wall Jamb (1) with the pencil mark
and drill the bottom hole into the shower wall using
1/8" drill bit. Note: Drill the hole through the pre-
drilled hole in the wall jamb.
STEP 5: Place a level against the Wall Jamb and
make sure the Wall Jamb is plumb. Mark the middle
and top hole drill locations.
All manuals and user guides at all-guides.com
STEP 2: Measure 1/4'' (6 mm) from the outside edge
of the threshold and make a pencil mark. This is a
location of the Wall Jamb (1). Repeat this step on the
other side wall.
STEP 4: Using a Long Screw # 8 x1" (11) provided,
fasten the Wall Jamb (1) to the wall.
STEP 6: Drill holes using a 1/8" drill bit and fasten the
Wall Jamb (1) using # 8 x 1" Long Screws (11).
½''
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cd 42nad42 nad

Table des Matières