AmazonBasics B07GF58DXB Mode D'emploi page 7

Ferrure de porte de grange 2 m (6,6 pieds) - en forme de j -noire
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Step 3: Track Installation
Attaching the track directly to the studs:
1. Using the 5 marks you made, drill a 1/4" (6 mm) pilot hole 1" - 3" (25 - 76 mm) deep on each
mark.
2. Slide the washer (G1) over the screw (G) and repeat for all 5 screws.
NOTICE
If the door is going to stop before the last hole (8" / 20 cm) on either end, then
the door stop C1 or C2 will need to be installed onto the rail first.
3. Position the track over the drilled holes.
4. Starting at one end of the track, insert the screw (G) through the track and then through the
spacer (B) and into the pilot hole.
5. Use a wrench to tighten the screw.
NOTICE
Do not tighten the screw completely until all screws are installed and the track
is level.
6. Repeat steps 4 and 5 for the remaining holes (checking with a level for each screw installed).
C3
A
C1
B
G1
G
7

Publicité

Table des Matières
loading

Table des Matières