AmazonBasics B07GF58DXB Mode D'emploi page 5

Ferrure de porte de grange 2 m (6,6 pieds) - en forme de j -noire
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Step 1: Track Preparation
Door height +
1.75" (44 mm)
NOTICE
If your door opening DOES NOT have trim going around it, follow the below
steps.
1. Using the layout above as reference, position the track where you would like it.
2. Using a stud finder, locate the studs where you want to attach the track.
3. Using a small nail, tap it into the drywall and make sure you have located the stud.
4. Using a pencil, mark the location of the stud.
5. Repeat steps 2 and 3 until you have five marks indicating you have found five wall studs.
6. Place the track on the wall and make sure the five pencil marks on the wall match up with the
five holes in the track.
7. If the holes in the track DO ALIGN with the marks on the wall, proceed to Track Installation.
8. If the holes in the track DO NOT ALIGN with the marks on the wall, then a header board will
need to be used.
2" (51 mm) minimum
on one side of
the door
Door
Floor
Keep level
Header board
(1 x 6 recommended)
Floor clearance:
Using the dimensions
shown will allow for a
3/8" (9.5 mm) space
between the door
Door opening
and floor.
5

Publicité

Table des Matières
loading

Table des Matières