GE JCK1000 Installation page 9

Masquer les pouces Voir aussi pour JCK1000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
Securing the Oven in the Opening
C
Sliding the Oven Into the
C1
Opening
side edges.
Drilling the Pilot Holes and
C2
Mounting the Oven
NOTE: Before drilling the pilot holes, make
-
sure the oven is pushed as far back into
the opening as it will go and is centered.
provided.
Mounting
Hole Loca-
tions (Hole
Locations
may vary)
WARNING:
must be used. Failure to do so could
result in the oven falling out of the
cabinet, causing serious injury.
vided.
NOTE:
The screws must be
a minimum of 6 mm
(1/4") from the front
of the cutout.
Mounting screws
-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jck3000Jck5000Jct3000Jct5000Pct7050

Table des Matières