Hardware Installation - Grandstream GWN7600LR Guide De Référence Rapide

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
Step 2: Plug the other end into the uplink port of the power over Ethernet
(PoE) switch.
Network Port

HARDWARE INSTALLATION

GWN7600LR can be mounted horizontally or vertically on a metal bar.
Please refer to the following steps for the appropriate installation.
Vertical Mounting
1. Prepare the Cover Bracket by inserting the 4 screws (PM8) into cor-
responding holes.
2. Attach the Cover Bracket with screws on the vertical Mounting Bolt
where GWN7600LR will be installed.
3. Assemble the Base Bracket with the Cover Bracket using provided
locknuts and screws (PM8).
1
RJ45 Ethernet Cable
to power over Ethernet
(PoE) Switch
3
2
~3~
4. Connect the Ethernet cable (RJ45) to the correct ports of your GWN-
7600LR.
5. Align the GWN7600LR with the Base Bracket and pull it down to the
right position.
6. Install the 2x Assembled screws to fix GWN7600LR on the Mounting
Bolt.
4
Horizontal Mounting
1. Prepare the Cover Bracket by inserting the 4 screws (PM8) into cor-
responding holes.
2. Attach the Cover Bracket with screws on the horizontal Mounting Bolt
where GWN7600LR will be installed.
3. Assemble the Base Bracket with the Cover Bracket using provided
locknuts and screws (PM8).
2
1
5
3
~4~

Publicité

Table des Matières
loading

Table des Matières