Installation Instructions - GE RAK204 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

STEP 1
Screws
• Disconnect all power to the unit.
• Remove the three panels from the front of the sub base by removing the 5/16" screws.
• Retain the middle and right hand side panels and all of the screws.
STEP 2
Ground Wire
To Receptacle Outlet
To Power Source
• Place the Sub base switch in the "OFF" position.
• Hold the sub base switch assembly and thread the wires into the left side opening and across toward the right side
of the sub base.
• The wires labeled "To Power Source" will continue until the far right section of the sub base.
• The wires labeled "To Receptacle Outlet" and "Ground wire" will continue to the middle section.
2

Publicité

Table des Matières
loading

Table des Matières