Twin-Star International 33WM630 Manuel D'instruction page 4

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Locate the Left Corner Post (H), Line up
the holes in the mounting blocks on the
panel with the holes on the Left Front
Panel(B). Insert Bolt (L) and washer(M)
into the Pre-drilled holes in the mounting
blocks.
HAND TIGHTEN ONLY.
5. Locate the Right Corner Post (I), Line up
the holes in the mounting blocks on the
panel with the holes on the Right Front
Panel(C). Insert Bolt (L) and washer(M)
into the Pre-drilled holes in the mounting
blocks.
HAND TIGHTEN ONLY.
6. Locate Hearth/Base (A) and set out fin-
ished side up on the floor.
7. Insert one Wood Dowel (N) into each of
the pre-drilled holes.
8. Attach the completed Front assembly
from step 5 to the Hearth/Base (A).
Make sure that dowels seat into the pre-
drilled holes in the Hearth/Base. Using
Bolt (L) and Washer (M) attach panels
through pre-drilled holes in the mounting
blocks.
HAND TIGHTEN ONLY.
9. Locate Left Side Panel (E) ,insert one
Wood Dowel (N) into each of the
pre-drilled holes.Then use Bolt (L)
and Washer (M) through the pre-drilled holes
in the mounting blocks. Attach the Side
Panel to Hearth/Base (A) and the
completed front assembly.
HAND TIGHTEN ONLY.
10. Locate Right Side Panel (F),
Wood Dowel (N) into each of the pre-drilled
holes on the bottom edge of the panel.
Slide into place,and attach to Hearth/Base
with Bolt (L) and Washer (M) through the
pre-drilled holes in the mounting blocks.
Then attach to completed front assembly
using Bolt (L) and Washer (M).
HAND TIGHTEN ONLY.
E-3
All manuals and user guides at all-guides.com
Right
Corner
Post
I
i
nsert one
Completed
Front
Assembly
M
L
L
M
Hearth/Base
A
F
Right
Side
Panel
Left
Corner
Post
H
Left
E
Side
Panel
L
M
M
L

Publicité

Table des Matières
loading

Table des Matières