INSTALLATION INSTRUCTIONS
Use caution when unpacking and installing. Sharp edges can cause injury.
STEP 1: INSTALLING THE UPPER RAIL (IF NOT ALREADY ATTACHED)
1. Your upper rail may have come with the upper rail seal already affixed to the bot-
tom of the rail. If it was included separately, peel the backing off and affix it to the
bottom of the rail ensuring that the holes in the seal match up with the screw
holes in the rail. (Fig. A)
2. Use the 4 screws (included){to attach the upper rail to the pre-drilled holes on
the top of the cabinet as shown in the graphic. Ensure that the higher part of the
rail is facing the front of the air conditioning unit. (Fig. B)
STEP 2: MOUNTING THE FLEXIBLE FILLER PANELS
1. Note the "LEFT" and "RIGHT" markings on the panels.
2. Extend the flexible part of the filler panel past the filler panel's frame
3. Slide the T-section into the side guide rails on the left and right of the unit.
4. Gently insert the upper and lower ends of the panel frame into the upper and low-
er rail channels on the air conditioning unit.
T-section
All manuals and user guides at all-guides.com
Upper Rail
Upper Rail seal
Fig. A
1
–13–
Fig. B
2
Upper Rail
Lower Rail