Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3
INSTALL, TUB SPOUT, SHOWER HEAD,
SHOWER ARM WITH FLANGE
Protect finish on SHOWER HEAD
CAUTION
and TUB SPOUT when installing.
Note: Apply sealant or Teflon Tape to shower arm.
• Remove PIPE PLUG and CAP (1, 2) from shower pipe
and tub filler pipe.
• Install SHOWER ESCUTCHEON (3) onto SHOWER ARM (4).
Apply sealant or Teflon tape to threads on both ends of SHOWER
ARM (4) and thread longer leg of SHOWER ARM (4) into shower
elbow.
• Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Install TUB SPOUT (6). Tighten with HEX WRENCH
supplied.
Important: Do not overtighten Set Screw.
4

INSTALL HANDLE

• Hold ADAPTER (1) onto VALVE STEM (2) and install
ADAPTER SCREW (3) through ADAPTER (1) into
VALVE STEM (2).Tighten ADAPTER SCREW (3) to
secure ADAPTER (1) to VALVE STEM (2).
• Install HANDLE BASE (4) onto ADAPTER (1). Insert
SET SCREW (5) into HANDLE BASE (4). Align
HANDLE BASE (4) and tighten with HEX
WRENCH (6) supplied.
5
ADJUST HOT LIMIT STOP
• By restricting HANDLE rotation and limiting the amount of hot water
allowed to mix with the cold, the HOT LIMIT SAFETY STOP (1)
reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet valve, adjust the setting on the HOT LIMIT
SAFETY STOP (1).
• Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before
making adjustment to HOT LIMIT STOP (1). Pull forward and rotate
counterclockwise one number to limit hot water temperature.
Use NUMBERS (5) on CARTRIDGE (4) on HOT LIMIT STOP (1)
for indication.
1
1-1/2"
4
1
(Larger Numbers)
1 2 3 4 5 6 7 8 9 10
- 3 -
3
O-RING
4
5
APPLY SEALANT OR
TEFLON TAPE TO THREADS
2
6
HEX WRENCH
3
5
1
2
6
5
2
HOTTER
(Smaller Numbers)
1 2 3 4 5 6 7 8 9 10
3
COLDER
M965934 Rev. 1.1 (3/20)
4

Publicité

Table des Matières
loading

Table des Matières