Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
Preparation
A.
Before assembling make sure that you will have enough space around the item.
B.
Use the present tooling for assembling.
C.
Before assembling please check whether all needed parts are available. Under the QR code / link on the
previous page you will find a numbered exploded drawing with all the individual parts that make up the speed
bike.

Assembly instruction:

1
2
ASSEMBLY INSTRUCTION
Firmly tighten all component parts and pre-assembled parts!
Re-check the tightness before each training session!
1.2
2.2
1)
Connect the front tube with the frame, and
install the plain washer Ø10, washer 10
to the bolts and put on the cover-shaped
screws. And use open spanner to fasten
them. Installation of back tube is the same.
Note: Please adjust the black feet strap to make it
balance if it is not stable.
2)
The feet straps are marked with L and R.
Please drop 2 red screw locking liquid in
R strap and fasten it with right threaded
hole by using our spanner. And drop 2 red
screw locking liquid in L strap and fasten it
with left threaded hole.
Note: L and R are marked in crank as well. Please
install them accordingly otherwise it will damage
the products. And please fasten the feet strap, or
it will fall down after long usage.
22

Publicité

Table des Matières
loading

Table des Matières