Installation; Safety; Safety Instructions For Installation; Protective Equipment - probst SPEEDY VS-140/200 Instructions D'emploi

Pose dalles manuel par aspiration
Masquer les pouces Voir aussi pour SPEEDY VS-140/200:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Installation

6.1 Safety

6.1.1 Safety Instructions for Installation

The lifting device must be installed and maintained only by qualified specialist electricians and mechanics.
WARNING
Improper assembly
Serious injury or death!
Carry out mounting and removal only when the device is in an idle, depressurized state.
Ensure that the lift capacity of the hoist (crane, chain hoist, lifting tackle, etc.) is at least equal to the
sum of the lifting device's weight and lift capacity.
Ensure that the hoist is in perfect working order.
Only hang the lifting device from the suspension eye.

6.1.2 Protective Equipment

 The following protective equipment is required for handling purposes:
Protective work shoes
Sturdy work gloves

6.2 Start of Operations

1. Check that all screws are securely fastened.
2. Check the vacuum system for leaks Checking the Lifting Device for Leaks
3. Check all functions of the lifting device.
4. Perform several lifting tests with one load.
 Installation is finished once the lifting tests have been performed successfully.
The checks required in Europe before the start of operations in accordance with EN 13155 are covered by a
type test.
52700015 / 52700016 / 52700017 / 52700018 / 52700019 / 52700020
Installation
19 / 41

Publicité

Chapitres

Table des Matières
loading

Table des Matières