Télécharger Imprimer la page

RDI AVALON Instructions Pour L'installation page 2

Panneaux de verre
Masquer les pouces Voir aussi pour AVALON:

Publicité

Les langues disponibles

Les langues disponibles

Need a little help installing your railing?
www.rdirail.com/support/installation-videos.html
POST INSTALLATION
TOOLS NEEDED:
– Safety goggles
– Tape measure
– Pencil
– Level
– Power screwdriver/drill
/
" fasteners
3
8
– Chalk line tool
– Wood chisel or utility knife
2
1.
LAG BOLT APPLICATION
Determine the desired rail placement and
snap a line on to the deck to ensure that all
posts are aligned properly (Fig. 1). Ensure
sufficient mounting structure exists in the
areas to receive posts and install blocking if
necessary. Plumb the posts using the shims
provided, secure the posts in place (Fig. 2),
and install trim ring on each post.
THROUGH BOLT APPLICATIONS
For through bolt applications, use the provided
secondary mounting plate when securing
posts in place. Drill though the mounting
surface using a
/
" drill bit. Using appropriate
3
8
hardware (sold separately), align bolts through
the post mounting flange and secondary
mounting plate. Tighten bolts, secure in place,
and install trim ring on each post.
NOTE: Post kits include post with connected
base plate, leveling shims, post cap, 1-piece
trim ring, and sandwich plate. Posts are
designed and manufactured to accept
fasteners. Post mounting hardware is sold
separately. Be sure to use appropriate
fasteners for your installation. For commercial
use, Avalon Heavy Duty posts are required.
Check local building codes for load
requirements.
Fig. 1
Tip: Leveling shims can be easily cut
using a wood chisel or utility knife. Please
keep safety in mind during installation and
ALWAYS wear safety goggles.
Fig. 2
/
"
3
8

Publicité

loading